Remodel Budget Planner

Remodel budgets die in the middle: the kitchen eats 40% before the bathrooms have bought a vanity, and the hallway flooring quietly never happens. This planner runs the other direction — it prices each room on your list at published 2026 national rates, splits your actual budget across them in proportion, and flags any room that falls below what even a cosmetic redo costs. Whatever the plan doesn't spend comes back to you as the contingency reserve, because a budget without a reserve stalls at the first opened wall.

Published Cost data last reviewed Re-checked quarterly

Free estimateInstant · State-adjusted

Everything you can spend — permits, design, materials and labor. Leftover stays your reserve.

Rooms the planner should price and split your budget across.

Baths getting a real redo — tub/shower, vanity, toilet, flooring.

Half baths — vanity, toilet, floor and walls, no shower plumbing.

Heated square footage — about 62% of it is treated as living-area refresh space.

Applied to every room in scope; the kitchen's appliance package follows the tier.

Costs are adjusted for labor and material rates in your state.

Low

$52,460

Typical

$65,580

High

$88,530

Prices adjusted for Texaslabor & material costs.

Cost itemLowHigh
Materials
Kitchen (midrange) — materials, fixtures & finishes$9,330$15,750
Full baths ×2 — materials, fixtures & finishes$8,870$14,970
Powder room — materials, fixtures & finishes$1,580$2,670
Living areas — 1,240 sq ft — materials, fixtures & finishes$5,710$9,640
Labor
Kitchen (midrange) — trade labor & installation$10,450$17,640
Full baths ×2 — trade labor & installation$6,650$11,230
Powder room — trade labor & installation$1,190$2,000
Living areas — 1,240 sq ft — trade labor & installation$5,240$8,840
Permits & fees
Permits, design fees & inspections (~7% of construction)$3,430$5,790
Estimated total$52,460$88,530

What this estimate assumes

  • Scope: the kitchen, 2 full baths, the powder room, 1,240 sq ft of living-area refresh at midrange finishes against a $75,000 budget.
  • The plan fits: $65,581 of work inside your $75,000 budget, leaving $9,419 (13%). Hold it as your contingency — a 10–20% reserve is the standard defense against mid-project surprises.
  • Cutting order, if you must: Angi's 2026 recoup table puts kitchens at 96% and bathrooms at 73% of cost recouped and living-room remodels at 50% — but interior paint at 107%, so protect the kitchen first and shrink the living refresh to paint before dropping a bathroom.
  • Range is 80%–135% of the computed plan — the spread between competitive bids and high-cost metros, plus allowance drift on fixtures.
  • Materials dollars scale with your state's materials index and labor with its labor index (baths run ~55% materials, kitchen ~45%, living areas ~50%; permits and design follow the plan's blend).
  • Not in these numbers: structural wall removal, additions, HVAC/electrical-panel/rewire upgrades, furniture, and whatever the walls are hiding — Angi lists water-damage repair at $1,400–$6,400 and old-plumbing replacement at $1,500–$15,000 among the common mid-project surprises.
Get real quotes

Typical cost ranges

What each room costs at national midrange rates
ProjectLowTypicalHigh
Kitchen (medium, ~150 sq ft) (per room)$15,000$27,000$42,000
Full bathroom (5×8) (per room)$6,000$10,500$15,000
Powder room / half bath (per room)$2,500$3,750$5,000
Living areas — flooring, paint & lighting (per 1,000 sq ft)$9,600$12,000$16,200
Kitchen: Angi's 2026 house-remodel table ($15,000–$42,000, avg $27,000). Bathrooms: HomeGuide ($6,000–$15,000 full bath; $2,500–$5,000 half bath). The living-area refresh is our $12/sq ft model (flooring + paint + lighting) — the low/high columns apply the same 80%/135% spread the calculator uses.
How far a budget goes — default scope (kitchen, 2 full baths, powder room, 1,240 sq ft refresh)
ProjectLowTypicalHigh
$30,000 budget — 4 rooms cut below viable (plan total)$24,000$30,000$40,500
$50,000 budget — 70¢ on the dollar (plan total)$40,000$50,000$67,500
$75,000 budget — fits — $3,706 left for contingency (plan total)$57,040$71,290$96,250
$100,000 budget — fits — $28,706 left for contingency (plan total)$57,040$71,290$96,250
$150,000 budget — fits — $78,706 left for contingency (plan total)$57,040$71,290$96,250
The full midrange plan prices out at $71,294 nationally. Below roughly $35,647 the scaler starts cutting rooms below their cosmetic floor (the living-area refresh hits its paint-and-lighting floor first), and the calculator flags them. Leftover budget is returned to you as the contingency reserve, not spent.
Cosmetic → midrange → upscale, room by room (national)
ProjectLowTypicalHigh
Kitchen (per room)$12,150$27,000$48,600
Full bathroom (per room)$4,730$10,500$18,900
Powder room (per room)$1,690$3,750$6,750
Living areas (per 1,000 sq ft)$6,000$12,000$21,600
Cosmetic ≈ 0.45× and upscale ≈ 1.8× the midrange figure, matching HomeGuide's kitchen bands ($60–$150 basic, $100–$250 mid, $250–$350+ high-end per sq ft). The cosmetic line is also the viability floor: the planner flags any room whose allocation falls below it.
Where a $75,000 budget goes — the default plan, room by room
ProjectLowTypicalHigh
Kitchen (midrange) (≈38% of plan)$21,600$27,000$36,450
Full baths ×2 (≈29% of plan)$16,800$21,000$28,350
Powder room (≈5% of plan)$3,000$3,750$5,060
Living areas — 1,240 sq ft (≈21% of plan)$11,900$14,880$20,090
Permits, design fees & inspections (≈7% of plan)$3,730$4,660$6,300
Typical column sums to the $71,294 plan (national rates); the planner's leftover $3,706 is your contingency reserve. "×2" rows are the combined figure for both rooms.

Frequently asked questions

How should I split a $50,000 remodel budget?

For the default scope (kitchen, two full baths, a powder room and a 1,240 sq ft living refresh), $50,000 doesn't cover the $71,294 midrange plan, so every room scales to 70¢ on the dollar: about $18,936 to the kitchen, $14,728 to the two full baths, $2,630 to the powder room and $10,436 to the living areas, plus the 7% permits-and-design line. No room falls below its cosmetic floor at that level, but the margin is thin — the same scope flags its first room (the living refresh, against its paint-and-lighting floor) just under $36,000, and below roughly $32,000 every room is flagged. That's the signal to defer a room to phase two rather than do all of them badly.

What percentage of a remodel budget should the kitchen get?

In the default whole-home plan the kitchen takes about 38% — the single largest room line, which matches why Angi pegs the average kitchen remodel at $27,000 against a $52,000 whole-house average. HomeGuide's kitchen budget breakdown explains where it goes: cabinets ~25%, appliances ~15%, counters ~10%, flooring ~7%, lighting ~5% of the kitchen's own budget.

How much contingency should I hold on a remodel?

Hold 10–20% of the budget, per HomeGuide's budgeting guidance — closer to 20% for older homes where plumbing, wiring or water damage lurk (Angi lists water-damage repair at $1,400–$6,400 and old-plumbing replacement at $1,500–$15,000 as common mid-project surprises). This planner never spends your leftover: at the default $75,000 budget the plan leaves $3,706 unallocated and tells you whether that reserve is thick enough.

Which room should I remodel first when money is tight?

Protect the kitchen first — Angi's 2026 recoup table puts kitchen remodels at 96% of cost returned, bathrooms at 73%, and living-room remodels at just 50%. Interior paint is the outlier at 107%, which is why the planner's advice when cutting is to shrink the living refresh down to paint-and-lighting before you drop a bathroom.

Is it cheaper to remodel everything at once or room by room?

All at once is usually cheaper per room: one mobilization of the crew, one round of permits and design fees, dumpsters and seal-offs shared across the job, and every wall opened just once. The tradeoff is cash and chaos — you live in a construction site for months and your contingency has to cover every room's surprises from one pot. Room by room costs more in mobilization but lets each phase's reserve fund the next decision; if you phase it, run this planner once per phase and roll each phase's leftover into the next phase's reserve — the failure mode is one thin contingency stretched across five simultaneous surprises.

Does the plan include permits, design fees and inspections?

Yes — the planner adds a soft-cost line worth about 7% of construction on top of the room allocations, drawn from HomeGuide's figures: design fees run 5–10% of a kitchen or bath budget, kitchen permits $500–$1,500 and bath permits $150–$600. Structural changes, additions or ADU-scale work need their own design budget — those have dedicated calculators.

Why do contractor quotes always come in above these numbers?

Three reasons: allowances (quotes assume budget-grade fixtures, then you upgrade mid-build), change orders, and what the walls reveal. Angi also notes labor is 40–60% of any remodel budget in high-wage markets, so the same scope prices very differently by state. This planner's whole job is to hold a reserve — 10–20% — so the first surprise is a budget event, not a project killer.

How much does my state change the plan?

Materially. The default $71,294 national plan scales to about $103,376 in Hawaii (labor ×1.45, materials ×1.45) and about $60,943 in Mississippi (labor ×0.80, materials ×0.91) — a swing of roughly $42,433. Labor-heavy scopes like kitchens move the most because they carry the larger labor share.

Related cost calculators

How this estimate is calculated

These notes are written for this tool alone: where its base prices come from, how the low–high window is derived, and what the figure deliberately leaves out.

  • Inputs: total budget, a scope preset (whole home, kitchen+baths, kitchen only, baths only, or living areas), full-bath and powder-room counts, home square footage, and a finish tier applied to every room in scope.
  • Base room costs are 2025–2026 national midrange figures: kitchen $27,000 (Angi's 2026 house-remodel table, $15,000–$42,000), full bath $10,500 (midpoint of HomeGuide's $6,000–$15,000; Angi averages $12,000), powder room $3,750 (midpoint of HomeGuide's $2,500–$5,000), and a living-area refresh at $12/sq ft — consistent with the LVP (~$7/sq ft installed) and paint rates in our dedicated calculators.
  • Tiers apply cosmetic ×0.45 / midrange ×1 / upscale ×1.8, tracking HomeGuide's kitchen bands ($60–$150 basic, $100–$250 mid, $250–$350+ high-end per sq ft).
  • If the budget covers the wishlist, every room is priced at full and the remainder returns as your contingency reserve; if not, every room scales by the same budget ÷ wishlist factor, and any room whose allocation falls below 45% of its own cost (50% for living areas — the paint-and-lighting floor) is flagged as below a viable redo.
  • A soft-cost line of 7% of construction covers permits, design fees and inspections (HomeGuide: design 5–10%, kitchen permits $500–$1,500, bath permits $150–$600).
  • Each room's materials share (baths 55%, kitchen 45%, living 50%, per HomeGuide's materials-60%+ rule and Angi's labor-40–60% rule) scales with your state's materials multiplier and the labor share with its labor multiplier; the published range is ×0.80 low / ×1.35 high on the whole plan.
  • Excludes structural wall removal, additions, HVAC/electrical-panel/rewire upgrades, furniture and remediation surprises — those have their own FixTally calculators or belong in your contingency.

Sources

Every cost constant above traces to the publishers listed here — the editorial gate requires at least two independent sources per calculator, each with the month we accessed it. FixTally is not affiliated with any of them.

  1. Angi — How Much Does It Cost to Remodel a House? [2026 Data] (kitchen avg $27,000, $15,000–$42,000; bathroom avg $12,000; labor 40–60% of budget; ROI table) — accessed 2026-09
  2. HomeGuide — 2025 Bathroom Remodel Cost (full bath $6,000–$15,000; half bath $2,500–$5,000; materials 60%+/labor 20%+; design 5–10%; permits $150–$600) — accessed 2026-09
  3. HomeGuide — 2025-2026 Kitchen Remodel Cost ($100–$250/sq ft; budget 10–20% contingency + 5–10% design fees; cabinets 25%, appliances 15%; permits $500–$1,500) — accessed 2026-09

Maintained by the FixTally Editorial Team — each quarter we re-check the cited prices, re-run every calculator’s math, and refresh the review dates shown on these pages.

Know your number — now get a real quote

Your estimate is a planning range. Compare it against free quotes from licensed, insured contractors before you hire.

Get a real quoteFree · No obligation · Verified local contractors