Home Addition Cost Calculator
Additions are quoted per square foot, but the rate swings by a factor of six depending on whether you're framing new walls or putting rooms over them — a garage conversion runs near $40 per square foot while a second story starts around $300. This calculator prices your project the way a general contractor builds the bid: shell and finish by size and tier, then foundation, electrical, plumbing, HVAC tie-in, plans and permits itemized separately. Set your state and every labor and material line adjusts to local rates.
Published Cost data last reviewed Re-checked quarterly
Building up runs 2–3× per square foot; a conversion is a fraction because the shell already exists.
Footprint of the new space — a 20×20 room is 400 sq ft.
For sunrooms, basic tracks 3-season pricing and upscale tracks 4-season.
Applies to bump-outs and ground-level sunrooms; ignored for second stories and garage conversions.
Rough-in, fixtures and the tie-in back to your existing drains and supply.
A mini-split is the usual answer when the existing system can't carry the extra load.
Second stories and any bearing-wall work almost always need engineered or architect-stamped plans.
Costs are adjusted for labor and material rates in your state.
Low
$32,480
Typical
$40,600
High
$54,810
Prices adjusted for National averagelabor & material costs.
| Cost item | Low | High |
|---|---|---|
| Materials | ||
| Shell, exterior & interior finish materials — 200 sq ft bump-out room addition, mid finish | $10,080 | $17,010 |
| Slab foundation & site work materials — concrete, rebar, vapor barrier | $650 | $1,090 |
| Labor | ||
| General-contractor labor — excavation watch through final punch list | $13,920 | $23,490 |
| Foundation labor — excavation, forms, pour & cure coordination | $790 | $1,340 |
| Permits & fees | ||
| Building permit & plan review | $960 | $1,620 |
| Other costs | ||
| Electrical extension — circuits, lighting, panel space | $1,840 | $3,110 |
| HVAC tie-in — extend existing ductwork & register | $2,240 | $3,780 |
| Draftsman / building-designer plans | $2,000 | $3,380 |
| Estimated total | $32,480 | $54,810 |
What this estimate assumes
- Range is 80%–135% of the computed typical — the low end is a sharp competitive bid with simple site access; the high end is high-cost metros, poor access or heavy structural surprises.
- Shell & finish construction is modeled at 42% materials / 58% labor: material dollars scale with your state's materials index, labor dollars with its labor index.
- Foundation & site work (200 sq ft × $9/sq ft) splits 45% materials / 55% labor.
- Electrical, plumbing, ductwork, draftsman and permit dollars scale with state labor rates; the mini-split is equipment, so it scales with materials. The architect fee (when selected) is 8% of the region-adjusted construction cost — published fees run 5%–20%.
Typical cost ranges
| Project | Low | Typical | High |
|---|---|---|---|
| Bump-out room addition — 200 sq ft, mid finish (turnkey) | $32,480 | $40,600 | $54,810 |
| Four-season sunroom — 200 sq ft, upscale (turnkey) | $50,830 | $63,540 | $85,780 |
| Second-story addition — 200 sq ft, mid finish (turnkey) | $62,450 | $78,060 | $105,380 |
| Garage conversion — 400 sq ft 2-car, mid finish (turnkey) | $21,030 | $26,290 | $35,490 |
| Project | Low | Typical | High |
|---|---|---|---|
| 12×12 bedroom (144 sq ft) (turnkey) | $25,180 | $31,470 | $42,490 |
| 14×15 bedroom (210 sq ft) (turnkey) | $33,780 | $42,230 | $57,010 |
| 16×20 family room (320 sq ft) (turnkey) | $48,130 | $60,160 | $81,220 |
| 20×20 great room (400 sq ft) (turnkey) | $58,560 | $73,200 | $98,820 |
| 20×30 primary suite (600 sq ft) (turnkey) | $84,640 | $105,800 | $142,830 |
| Project | Low | Typical | High |
|---|---|---|---|
| Basic finish (turnkey) | $46,560 | $58,200 | $78,570 |
| Mid finish (turnkey) | $58,560 | $73,200 | $98,820 |
| Upscale finish (turnkey) | $72,960 | $91,200 | $123,120 |
| Project | Low | Typical | High |
|---|---|---|---|
| Half bath — toilet + sink, rough-in and fixtures (typical) | $5,600 | $7,000 | $9,450 |
| Full bathroom — tub/shower, toilet, vanity (typical) | $12,000 | $15,000 | $20,250 |
| Kitchen hookups — drains, supply, venting (typical) | $17,600 | $22,000 | $29,700 |
| Extend existing ductwork to the new room (typical) | $2,240 | $2,800 | $3,780 |
| Ductless mini-split, installed (typical) | $3,600 | $4,500 | $6,080 |
| Draftsman / building-designer plans (typical) | $2,000 | $2,500 | $3,380 |
| Licensed architect — 8% of a $60,000 build (typical) | $3,840 | $4,800 | $6,480 |
| Building permit & plan review (bump-out) (typical) | $960 | $1,200 | $1,620 |
Frequently asked questions
How much does a 20×20 room addition cost?
About $73,200 at national-average rates for a mid-finish 400 sq ft bump-out with a slab foundation, HVAC tie-in, drafting fees and permit — which lands just past Angi's $20,900–$72,600 band for typical room additions and well past HomeGuide's note that 20×20 additions start around $50,000. A three-car-garage-deep 600 sq ft suite runs near $105,800.
Is it cheaper to build out or build a second story?
Building out is far cheaper per square foot: Angi's 2026 data puts ground-floor additions at $80–$200 per sq ft against $300–$500 per sq ft to build up, because going up means tearing off and re-building the roof over the footprint, reinforcing existing walls for the new loads, and adding a staircase. A 200 sq ft second-story addition prices at about $78,060 here versus $40,600 for the same 200 sq ft on the ground — going up only wins when the lot can't take a build-out.
Is a garage conversion the cheapest way to add a room?
Yes — the shell, slab, roof and walls already exist, so a 400 sq ft two-car conversion runs about $26,290 mid-finish versus $73,200 for the same size as new construction (HomeAdvisor pegs professional conversions at $6,003–$27,348). The budget still has to cover insulation, drywall, an egress window or door, extending HVAC and raising the floor if the slab sits below the house's finished floor — plus a permit, since it's a change of use.
What's the cost difference between a 3-season and 4-season sunroom?
For a 200 sq ft room, our model prices a basic three-season build (no duct extension) around $25,240 and a four-season room with a mini-split around $65,240 — bracketing HomeGuide's published 3-season and 4-season ranges. The jump buys thermally broken glazing, insulated walls and conditioning. It matters at appraisal too: most appraisers don't count a three-season room in finished living area, so a four-season build protects resale value.
Do I need an architect for a home addition?
Not always. Many jurisdictions accept drafted plans for a straightforward ground-floor bump-out — our model carries drafting at $2,500. You'll want an architect or structural engineer when the addition changes the structure: any second story, removing bearing walls, or unusual foundations (published architect fees run 5–20% of construction; we model 8%, about $4,800 on a $60,000 build). Your permit office will tell you what stamp your plan set needs.
How long does a home addition take?
Budget 4–12 weeks for design and permitting before anyone digs — longer in cities with slow plan review — then 6–16 weeks of construction. Real money leaves during the design window, before a shovel moves: drafting runs $2,500 (or 8% of construction for an architect) and the building permit $1,200 on a typical bump-out. Ground-floor bump-outs and garage conversions sit at the low end of the build window; second stories run the high end because the roof comes off mid-project and the weather owns your schedule. Foundation cure time (about a week for a slab) sits at the front of that window.
Will adding onto my house raise my property taxes?
In most states, yes — a permitted addition adds to your assessed value, and the assessor often picks it up from the permit filing, so the increase can show up within a year or two. The arithmetic is simple enough to preview: on this calculator's 400 sq ft default (about $73,200 of added value), every 0.25% of your local effective property-tax rate works out to roughly $183 more per year — multiply by your county's rate. The bump varies enormously by state (some cap assessment increases until you sell). Ask your local assessor's office for the reassessment practice before you budget, and note some cities also charge impact or utility connection fees on new floor area that this estimate doesn't include.
What is not included in this estimate?
Electrical panel upgrades or a second HVAC system, septic or sewer capacity upgrades, driveway cuts and landscaping repair after excavation, impact and connection fees, furnishings, and temporary housing if the work displaces your household. Lead-paint or asbestos abatement in pre-1980 homes is also excluded — that's its own licensed trade.
Related cost calculators
ADU Cost Calculator
Estimate ADU cost by type and square footage — detached, garage conversion, basement or JADU — with kitchen, bath, utilities, design and permits itemized.
Open calculatorGarage Build Cost Calculator
Estimate the cost to build a 1–3 car garage — attached or detached, slab, doors, openers, electrical and permits — with 2026 prices adjusted for your state.
Open calculatorBasement Finishing Cost Calculator
Estimate basement finishing cost in seconds — area, ceiling height, egress, bathroom, kitchenette and flooring — with 2026 prices adjusted for your state.
Open calculatorWhole House Remodel Cost Calculator
Estimate your whole house remodel cost in seconds — pick scope, finish tier, kitchen, baths and system toggles for an itemized range adjusted to your state.
Open calculatorHow this estimate is calculated
These notes are written for this tool alone: where its base prices come from, how the low–high window is derived, and what the figure deliberately leaves out.
- One model, four shapes: the addition type × square footage × finish tier sets the shell-and-finish construction rate, then foundation, electrical extension, plumbing, HVAC tie-in, design plans and the permit are itemized as separate lines that sum to the total.
- Base construction rates (2025–2026, mid finish): bump-out and sunroom $150/sq ft — inside Angi's $80–$200 build-out band, HomeGuide's $125–$250 and Fixr's $100–$300 (Fixr's all-in average is ≈$65,000 for 300 sq ft); second story $340/sq ft inside Angi's $300–$500 build-up band; garage conversion $40/sq ft against Angi's ~$25–$75 and HomeAdvisor's $6,003–$27,348 per job.
- Sunroom tier factors bracket the published season split: basic lands near 3-season pricing (~$105/sq ft of construction) and upscale near 4-season (~$270/sq ft).
- Construction splits 42% materials / 58% general-contractor labor; foundation splits 45% concrete & rebar / 55% excavation & formwork. Materials dollars scale with your state's materials index, labor dollars with its labor index; electrical, plumbing, duct extension, drafting and permit dollars scale with labor, mini-split equipment with materials, and the architect fee is 8% of the region-adjusted construction (published fees run 5%–20%).
- Every estimate shows low/typical/high at 80% / 100% / 135% of the computed typical — competitive-bid low end, high-cost-metro or structural-surprise high end.
- Foundation costs apply only to bump-outs and ground-level sunrooms; a second story bears on the existing structure and a garage conversion on the existing slab, so the field is ignored for both.
- Excludes panel or system upgrades, septic/sewer capacity work, impact and connection fees, driveway and landscape restoration, lead/asbestos abatement, furnishings and temporary housing.
Sources
Every cost constant above traces to the publishers listed here — the editorial gate requires at least two independent sources per calculator, each with the month we accessed it. FixTally is not affiliated with any of them.
- Angi — How Much Does a Home Addition Cost? [2026 Data] ($80–$200/sq ft building out; $300–$500/sq ft building up; architect-cost breakdown) — accessed 2026-09
- Angi — How Much Does a Room Addition Cost? [2026 Data] ($20,900–$72,600 typical room additions) — accessed 2026-09
- Fixr — House Addition Cost: Cost to Add a Room ($100–$300/sq ft finished; ≈$65,000 average for 300 sq ft) — accessed 2026-09
- HomeGuide — Home Addition Cost (2026) ($125–$250/sq ft average; 20×20 room addition $50,000+) — accessed 2026-09
- HomeAdvisor — 2025 Cost to Finish and Convert a Garage ($6,003–$27,348 professional garage conversion) — accessed 2026-09
Maintained by the FixTally Editorial Team — each quarter we re-check the cited prices, re-run every calculator’s math, and refresh the review dates shown on these pages.
Know your number — now get a real quote
Your estimate is a planning range. Compare it against free quotes from licensed, insured contractors before you hire.