Electrical Panel Cost Calculator

Electricians price panel work by scope before brand: a like-for-like swap is a half-day job, while moving from 100 to 200 amps pulls in the utility, new service-entrance conductors, grounding rods and an inspector. This calculator prices both paths the way contractors bid them — amperage, meter, grounding, breaker space, surge protection, permit and utility coordination — then adjusts labor and materials to your state. Get the range first and the quote that's wildly out of line is easy to spot.

Published Cost data last reviewed Re-checked quarterly

Free estimateInstant · State-adjusted

Swaps reuse the existing service entrance; upgrades rework it — that's the big cost line.

400 A is usually two 200 A mains — quote it mainly for big solar or multi-EV setups.

Read the number printed on your main breaker — it sets how much entrance work the upgrade needs.

A full panel is usually a space problem, not a capacity problem.

Required on most amperage changes; the utility may supply the socket itself.

Two rods is the NEC default for a new or upgraded service.

Any service-size change needs the utility to pull and restore power.

The 2020 NEC requires surge protection on new or replaced dwelling services.

Costs are adjusted for labor and material rates in your state.

Low

$3,750

Typical

$4,690

High

$6,330

Prices adjusted for Texaslabor & material costs.

Cost itemLowHigh
Materials
Panel equipment — 200 A main-breaker load center & breakers$500$840
Service upgrade materials — entrance conductors, mast & bonding$510$860
Grounding — 2 ground rods driven & bonded$90$160
Labor
Installation labor — swap, circuit terminations & labeling$1,020$1,720
Upgrade labor — service entrance rework & utility coordination$760$1,290
Grounding electrode labor$130$210
Permits & fees
Electrical permit & inspection fees$110$180
Utility disconnect/reconnect & coordination$630$1,070
Estimated total$3,750$6,330

What this estimate assumes

  • Range is 80%–135% of the computed typical — the spread between sharp competitive bids and high-cost metros, difficult locations, or corrosion/repair surprises inside the old panel.
  • Panel equipment scales with your state's material prices; electrician labor, meter and grounding work with its labor rates; permit and utility fees with the labor multiplier (see the regional note under the results).
  • Priced for a panel in the same location; relocating the panel or the meter outside adds framing, conduit and drywall work not shown here.
  • A service-size change assumes the utility only needs a disconnect/reconnect — transformer or service-drop replacement can add thousands more (see the FAQ) and is excluded.
  • This line prices a full service upgrade — new entrance conductors and grounding rework included. Some 2026 guides quote roughly $1,300–$3,000 for the same 100→200 A jump when the existing service entrance is reused (Angi and This Old House data), so check what a lower bid actually includes before comparing.
Get real quotes

Typical cost ranges

Electrical panel cost by service size and scope
ProjectLowTypicalHigh
100 A like-for-like swap (installed)$1,200$1,500$2,030
150 A like-for-like swap (installed)$1,520$1,900$2,570
200 A like-for-like swap (installed)$1,800$2,250$3,040
400 A service (dual 200 A mains) (installed)$2,720$3,400$4,590
100 A → 200 A upgrade (installed)$3,200$4,000$5,400
60 A-or-less → 200 A full service upgrade (installed)$4,800$6,000$8,100
National-average labor and materials, permit only, no add-ons. Swap = same amperage in the same location; upgrade = new service entrance. Midpoints match Caudill's published ranges ($1,500–$3,000 swap; $2,500–$4,000 for 150→200 A; $3,000–$5,000 for 100→200 A; $4,000–$8,000 for 60 A-or-less → 200 A; $5,000–$12,000 for 400 A).
What each panel-job add-on costs
ProjectLowTypicalHigh
100 A sub-panel (garage / addition) (add-on)$2,560$3,200$4,320
Tandem breakers to free panel space (add-on)$2,000$2,500$3,380
Meter socket replacement + utility reconnection (add-on)$2,280$2,850$3,850
Two ground rods driven & bonded (add-on)$2,040$2,550$3,440
Utility disconnect/reconnect & coordination (add-on)$2,520$3,150$4,250
Whole-house surge protector (Type 2) (add-on)$2,140$2,680$3,620
Each row prices that add-on alone on top of a bare swap, at national-average rates. HomeGuide publishes $500–$1,500 installed for a 100 A sub-panel and $200–$800 installed for a whole-house surge protector — both midpoints reproduced here.
Three real-world 200 A projects, priced end to end
ProjectLowTypicalHigh
Post-2000 home — 200 A safety swap, permit only (turnkey)$1,800$2,250$3,040
1960s home — 100→200 A + meter, 2 ground rods, utility coordination (turnkey)$4,640$5,800$7,830
Pre-1960 home — 60 A→200 A + meter, 2 ground rods, utility, surge (turnkey)$6,580$8,230$11,110
Whole-project totals: equipment + labor + the add-ons listed, at national-average rates. A pre-1960 home can additionally trigger knob-and-tube rewiring of $10,000–$30,000 — deliberately excluded here.

Frequently asked questions

How much does it cost to upgrade from 100 to 200 amps?

About $4,000 nationally for the service upgrade itself — inside the $3,000–$5,000 range Caudill's 2026 guide publishes for 1960–2000 homes, and near Fixr's $4,000 high-end figure for 200-amp work. Adding a new meter socket, two ground rods and full utility coordination — typical on a real 100→200 A job — lands the whole project near $5,800 before regional adjustment.

Why is a same-capacity panel replacement so much cheaper than an upgrade?

A 200 A swap keeps the service entrance, meter and grounding exactly as they are, so the crew is in and out in 4–8 hours — about $2,250 installed. Increasing the amperage legally requires new entrance conductors sized for the load, a grounding system rework, a permit, and the utility to pull and reconnect the meter, which roughly doubles the labor. Caudill's notes same-location swaps avoid the permit complications and run 30–40% less labor than service upgrades.

How long does a panel upgrade take, and how long is the power out?

The physical swap is 4–8 hours with power off for most of that; plan for the fridge, medical devices and remote work accordingly. The longer pole is scheduling: the permit must be pulled before work and inspected after (1–3 business days in most jurisdictions), and any utility-coordination step adds days to weeks. Caudill's flags that projects needing transformer-level utility work can stretch 3–6 months.

Do I need a permit to replace my electrical panel?

Yes, essentially everywhere in the US — a panel is service equipment, and the permit ($50–$300 depending on jurisdiction; $150 modeled here) pays for an inspector to verify the work. Skipping it can void the electrician's license protection, your homeowner's insurance coverage for electrical fires, and your ability to sell without disclosures. If a contractor suggests working without one, that is your cue to walk.

The utility company is involved — what are they responsible for?

The utility owns the service drop and the meter, and only its technician may pull and reinstall the meter around the work — your electrician schedules the disconnect/reconnect appointment, and the $900 coordination line here models those fees plus the scheduling overhead. Book that window before the panel is even ordered: utility lead times run days to weeks in some territories, and nothing can be energized until the meter goes back in. True utility-side construction — moving the drop, upgrading the transformer — is billed separately and can add $2,000–$25,000 in extreme cases (Caudill's), which is why this calculator excludes it.

My panel is full — do I need a bigger service, or will a sub-panel do?

Usually a sub-panel. Full panels are a space problem, not a capacity problem: tandem breakers (~$250) or a 100 A sub-panel (~$3,200 installed) frees slots for a fraction of a service upgrade. You only genuinely need more amperage when the *load calculation* exceeds the main breaker — whole-house heat pumps, a 48 A EV charger, a large solar array. Caudill's notes smart panels and load-management devices let roughly a third of 100 A homes skip the service upgrade entirely.

Is a whole-house surge protector worth adding while the panel is open?

Yes — and at $2,680 installed (HomeGuide publishes $200–$800) it's the cheapest line on this page. The 2020 NEC now requires surge protection on new or replaced dwelling services anyway, so if you're upgrading, an electrician will likely quote it. It clamps lightning and grid surges before they reach HVAC boards, EV chargers and electronics that cost far more than the device.

Does upgrading to 200 amps add home value?

Not as a line item — appraisers don't credit panels — but it removes three deal-killers. Home inspectors flag 60–100 A fused panels and legacy hazard brands as safety items buyers price into offers; insurers increasingly surcharge, require an upgrade, or decline renewals on them; and 200 A service is the de-facto prerequisite for a 48 A EV charger, heat pumps, induction cooking and solar — upgrades that do carry appraisal value. Caudill's points out that 200→400 A upgrades are almost exclusively for large solar arrays and multiple EVs — so for most homes a $6,000-class 200 A service is the sweet spot, not 400 A.

Related cost calculators

How this estimate is calculated

These notes are written for this tool alone: where its base prices come from, how the low–high window is derived, and what the figure deliberately leaves out.

  • Three scopes feed one cost model: like-for-like swap, amperage upgrade (priced as swap base + a service-entrance premium that scales with how small your current service is), or an add-on sub-panel.
  • Base rates are 2025–2026 national data anchored on Caudill's 2026 panel-upgrade guide — $1,500–$3,000 for a 200 A swap, $2,500–$4,000 for 150→200 A, $3,000–$5,000 for 100→200 A, $4,000–$8,000 for 60 A-or-less → 200 A, $5,000–$12,000 for 200→400 A — with Fixr's guide corroborating the swap range ($1,000 low for 100 A, $4,000 high for 200 A) and HomeGuide covering sub-panels ($500–$1,500 for 100 A) and surge protection ($200–$800 installed).
  • The model reproduces each published anchor at national-average rates: a 200 A swap totals $2,250, 100→200 A lands at $4,000, and 200→400 A at $8,500 — the table above shows the matching rows.
  • Add-ons are itemized, not baked in: meter socket + reconnection $600, ground rods $150 each, tandem breakers $250, permit $150, utility disconnect/reconnect & coordination $900, whole-house surge protector $430.
  • Every estimate shows low/typical/high at 80% / 100% / 135% of the computed typical — the spread between competitive bids and high-cost metros or corroded/difficult existing equipment.
  • Material lines scale with your state's materials multiplier; labor, meter and grounding installation with its labor multiplier; permit and utility fees with labor.
  • Excludes knob-and-tube or aluminum branch-circuit rewiring (a pre-1960 home can add $10,000–$30,000), transformer or service-drop replacement (Caudill's: $2,000–$25,000, weeks-to-months timelines), solar/EV circuit runs, and panel or meter relocation.

Sources

Every cost constant above traces to the publishers listed here — the editorial gate requires at least two independent sources per calculator, each with the month we accessed it. FixTally is not affiliated with any of them.

  1. Caudill's Electric — Electrical Panel Upgrade Cost Guide (2026 pricing analysis: swap $1,500–$3,000; 100→200 A $3,000–$5,000; 60 A→200 A $4,000–$8,000; 200→400 A $5,000–$12,000; utility coordination +$2,000–$25,000) — accessed 2026-09
  2. Fixr — Electrical Panel Upgrade Cost (100 A replacement starts ~$1,000; 200 A reaches $4,000 at the high end) — accessed 2026-09
  3. HomeGuide — 2025 Cost To Install A Subpanel (sub-panel installation $500–$1,500 for 100 A including labor and materials — the range behind this model's sub-panel pricing) — accessed 2026-09
  4. HomeGuide — Whole-House Surge Protector Installation Cost, 2025 ($60–$500+ for the unit alone, $200–$800 installed — the range behind this model's surge-pricing add-on) — accessed 2026-09

Maintained by the FixTally Editorial Team — each quarter we re-check the cited prices, re-run every calculator’s math, and refresh the review dates shown on these pages.

Know your number — now get a real quote

Your estimate is a planning range. Compare it against free quotes from licensed, insured contractors before you hire.

Get a real quoteFree · No obligation · Verified local contractors